Advisors on "Boskov Most" and "Lukovo Pole" chosen.
Macedonian state-owned power producer ELEM has picked a Swiss consortium to advice on the implementation of the Boskov Most hydro power plant project. The 58-month contract for advisory services, worth 3.4 million euro was signed with Swiss companies Stucky and AF Consult.
The assignments of the consultants will be divided into several stages: preparation of final project documents; preparation of a tender for the supply of equipment and for selecting a contractor for the construction works and the site supervision; providing support in bringing the plant on stream.
The construction of the 70 megawatt Boskov Most power station, which will be located near the western town of Debar, should start in the second quarter of 2012, Macedonia's Finance Ministry said on Thursday. In the beginning of November, the European Bank for Reconstruction and Development (EBRD) agreed to lend 65 million euros to Macedonia for construction of the Boskov Most hydroelectric project. ELEM also recruited advisors on the Lukovo Pole Dam -- "Civil Engineering Institute "Makedonija" to provide geological investigation services for the project whereas German Poyry Infra was chosen from among five bidders for the environmental and social assessment contract.
http://www.thefreelibrary.com/Advisors+on+%22Boskov+Most%22+and+%22Lukovo+Pole%2 2+chosen.-a0275853533
-
-
Pėr: Qeveria maqedonase miraton devijimin e lumit Radikė. Rama: Nuk ka projekt
Tek faqja zyrtare e Kompanise Elektroenergjitike te Maqedonise (ELEM) eshte paraqitur dhe projekti Lukovo Pole.
http://www.elem.com.mk/en/3d-presentations
-
-
Pėr: Qeveria maqedonase miraton devijimin e lumit Radikė. Rama: Nuk ka projekt
-
-
Pėr: Qeveria maqedonase miraton devijimin e lumit Radikė. Rama: Nuk ka projekt
-
-
Pėr: Qeveria maqedonase miraton devijimin e lumit Radikė. Rama: Nuk ka projekt
-
-
Pėr: Qeveria maqedonase miraton devijimin e lumit Radikė. Rama: Nuk ka projekt
Sipas ministrit shqiptar ne qeverine e Maqedonise:
Among the energy projects, Minister Saraqini pointed HPP “Boskov Most” and the accumulation “Lukovo Pole” clarifying that until the end of this year will start the preparation construction works at HPP “Boskov Most”, project with value of €107 million. During 2014 and after the completion of the studies for the influence on the environment and the social aspects will start the construction of the accumulation “Lukovo Pole” with which will be secured additional 156 GwH. The funds for these two projects are secured from EBRD and World Bank.
http://www.economy.gov.mk/EN/news/3494.html
-
-
Pėr: Qeveria maqedonase miraton devijimin e lumit Radikė. Rama: Nuk ka projekt
ELEM launched preparations for Lukovo Pole project
13.4.2011 14:10:00 | Author/Source PressCut
Power utility Elektrane Makedonije has signed a contract on a EUR 2.24 million worth loan with the World Bank. The loan means are meant for preparations for the construction of the Lukovo Pole accumulation lake. Total of EUR 3.4 million is necessary for preparatory works, while the rest EUR 1.16 million will be provided by ELEM.
According to the Macedonian power utility, an assessment of the impact on physical and social environment and additional geological explorations will be conducted within a year, engineers will be hired with the task to update projects and prepare tender documentation.
(Dnevnik)
-
Regullat e Postimit
- Ju nuk mund tė hapni tema tė reja.
- Ju nuk mund tė postoni nė tema.
- Ju nuk mund tė bashkėngjitni skedarė.
- Ju nuk mund tė ndryshoni postimet tuaja.
-
Rregullat e Forumit
Krijoni Kontakt